Monday, Oct 26th

Last update04:59:38 PM GMT

You are here::

5.1km of Padma Bridge visible after installation of 34th span

5.1km of Padma Bridge visible after installation of 34th span

The 34th span of the Padma Bridge was installed on SUnday, bringing a total of over 5.1 kilometers of the structure into view.The span number ‘2A’ was installed between 7 and 8 no pillars at Mawa point, six days after the last one was set up.Executive Engineer (Bridge) Dewan Md Abdul Quader confirme...

Covid-19 in Bangladesh

 23 more die, 1,308 test positive in 24hrs
Bangladesh reported 23 new deaths from the novel coronavirus infection in a daily count, taking a total of 5,803.Another 1,308 coronavirus patients are found in 24 hours, raising the total number of infections to 398,815.A press release of the Directorate Ge...

Dhaka seeks Tokyo's support over Rohingya repatriation

Dhaka seeks Tokyo's support over Rohingya repatriation

Foreign Minister Dr AK Abdul Momen has sought Japan’s strong support in resolving the Rohingya crisis.Stressing the need for ensuring peace, stability and prosperity of the region, he urged Japanese Ambassador Naoki Ito to use its leverage with Myanmar to create a conducive environment for an early,...